To resist rutting on the heaviest road in the North is a huge challenge for both the base layer and 2 PMB layers (PMB-I and PMB-III). Day or night, this road is always busy with container trucks & heavy trucks from Hai Phong Port to almost all industrial zones and northern provinces (Hai Duong, Hung Yen to Ha Noi, and all development provinces in the North, such as Bac Giang, Bac Ninh, and Vinh Phuc). The VIDIFI requires the highest quality of PMB for the trial junction for 1 year of validation before main route repair works begin. KBC Napthanic 60/70 with a high softening point is used to make high modulus asphalt base C25.

 

Project name: NH5A Ha Noi - Hai Phong (Hai Duong and Hung Yen Section)
Products: PMB PG76 & PG82, PMB1 & PMB3, 60/70 Bitumen, CRS1p
Years: 2021
Location: Hai Duong & Hung Yen
Investors:  VIDIFI & Hai Duong City
Contractors: Infrasol, 656 Co. 703 Co, Licogi18
Consultant: TEDI - HECO
Scope of project: 30km upgrading with super heavy intersections
Construction section: 60/70 KBC rutting resistance base, PMBI, and PMB3 for binder & surface
 

Other Projects

Maybe you are interested in our other signature projects

Ha Noi Formula 1 Racetrack

Ha Noi Formula 1 Racetrack

A showcase of innovation and expertise for the first-ever Formula 1 racetrack in Vietnam. Ha Noi Formula 1 Racetrack (North Vietnam) - total length of 5.6 km, includes 23 turns, with a unique hybrid design, combining a street circuit's characteristic with a permanent track layout to reach a top speed of 335 km/h for F1 car drivers; first ever in the history of Vietnam and the circuit itself. The designing and paving works of high-standard racetrack pavement were done under the supervision of a German F1 accredited consultant. ADCo was awarded for the supply of a complete range of bituminous binder for Ha Noi F1 Race track including:   More than 1,500 MT polymer-modified bitumen for wearing and binder course following MSCR PG specification More than 800 MT Naphthenic based Bitumen from KBC (the Group refinery in Malaysia) for Base course Polymer Modified Emulsion for Tack coat ADCo Trackless System - A first in Viet Nam was implemented and sprayed by ADCo to preserve the integrity of the tack coat and ensure cleanliness of the site ADCo Anti-sticking agent (ASC) from the Group was part of the package for asphalt paving application.   Project name: Ha Noi Formula 1 Racetrack Products: PMB III, 60/70 Bitumen, CRS-1P Year: 2019 - 2020 Location: Ha Noi Investors: VINGROUP - Ha noi City Contractors: Minh Tam Consultant: Tilke - Germany Construction section:  2 layer of PMB III F1 including binder and wearing course on existing road 3 layers of asphalt including 60/70 KBC base course & PMB III F1 binder and wearing course for new construction