img_banner-1

National road No.1A

The largest road rehabilitation project in Vietnam.
The biggest ODA project in Vietnam to upgrade the most important North-South connectivity of 2,300 km from Lang Son province to Ca Mau province, funded by the two biggest international fund organizations, WB and ADB. The Vietnamese project owner, consultant, and contractor in Vietnam gain knowledge from analyzing international construction methods and standards of road construction, for instance, sending bulk bitumen instead of drums. ADCo supplied 250,000 ton of bitumen for all projects to upgrade NH1 from North - Central to South Vietnam.
 
Project name: National road No.1A
Products: 60/70. CRS1
Years: 1997-2006
Location: Ha Noi - Bac Ninh - Lang Son - Ninh Binh - Thanh Hoa - Nghe An - Ha Tinh - Quang Binh - Quang Tri - Hue - Da Nang - Quang Nam - Quang Ngai - Binh Dinh - Phu Yen - Nha Trang - TP Ho Chi Minh - Tien Giang - My Tho - Can Tho - Soc Trang - Ca Mau
Investors:  PMU1
Contractors: CIENCO 1, CIENCO 4, CIENCO 5, CIENCO 6, CIENCO 8, TCT Truong Son Corp., Thanh An Corp., 319 Corp.
Consultant: TEDI, Thang Long, TECCO2, Truong Son
Scope of project: 2300 km of 2 - 4 lanes (cross City area)
Construction section: Binder & surface asphalt layer

Other Projects

Maybe you are interested in our other signature projects

Ha Noi Formula 1 Racetrack

Ha Noi Formula 1 Racetrack

A showcase of innovation and expertise for the first-ever Formula 1 racetrack in Vietnam. Ha Noi Formula 1 Racetrack (North Vietnam) - total length of 5.6 km, includes 23 turns, with a unique hybrid design, combining a street circuit's characteristic with a permanent track layout to reach a top speed of 335 km/h for F1 car drivers; first ever in the history of Vietnam and the circuit itself. The designing and paving works of high-standard racetrack pavement were done under the supervision of a German F1 accredited consultant. ADCo was awarded for the supply of a complete range of bituminous binder for Ha Noi F1 Race track including:   More than 1,500 MT polymer-modified bitumen for wearing and binder course following MSCR PG specification More than 800 MT Naphthenic based Bitumen from KBC (the Group refinery in Malaysia) for Base course Polymer Modified Emulsion for Tack coat ADCo Trackless System - A first in Viet Nam was implemented and sprayed by ADCo to preserve the integrity of the tack coat and ensure cleanliness of the site ADCo Anti-sticking agent (ASC) from the Group was part of the package for asphalt paving application.   Project name: Ha Noi Formula 1 Racetrack Products: PMB III, 60/70 Bitumen, CRS-1P Year: 2019 - 2020 Location: Ha Noi Investors: VINGROUP - Ha noi City Contractors: Minh Tam Consultant: Tilke - Germany Construction section:  2 layer of PMB III F1 including binder and wearing course on existing road 3 layers of asphalt including 60/70 KBC base course & PMB III F1 binder and wearing course for new construction