Bach Dang - Ha Long & Ha Long - Van Don Expressway and extension of NH18 and Van Don – Cam Hai

The second-longest BOT expressway in northern Vietnam.
Ha Long - Van Don and extension of NH18 is the second-longest BOT expressway in the North. The 85km projects aim to connect the two biggest provinces in the North with large seaports such as Hai Phong and Quang Ninh to Van Don new Airport and with the Chinese border. The No.18A upgrading had a high rutting requirement with AC over a concrete slab, which was constructed specifically for the transportation of heavy coal trucks. ADCo supplied 6,000 MT of products, including bitumen 60/70, PMB, CRS 1, CRS1P and Novabond
 
Projects name: Bach Dang Bridge - Ha Long & Ha Long - Van Don Expressway and extension of NH18 and Van Don Cam Hai
Products: PMBIII, 60/70, CRS1P, Novabond
Years: 2016-2018
Location: Quang Ninh
Investors:  Biên Cương Co & PMU Quang Ninh
Contractors: LICOGi16, Vinadelta, BMT, An Phat, Phu Thinh, Phuong Thanh, Hoa Hiep, 471 Co.
Consultant: TEDI – TEDI North
Scope of project: 85km highway standard with 4 lanes
Construction section: wearing asphalt for NH18 & Asphalt base (ATB), binder - suface & Novachip for new construction

Other Projects

Maybe you are interested in our other signature projects

Ha Noi Formula 1 Racetrack

Ha Noi Formula 1 Racetrack

A showcase of innovation and expertise for the first-ever Formula 1 racetrack in Vietnam. Ha Noi Formula 1 Racetrack (North Vietnam) - total length of 5.6 km, includes 23 turns, with a unique hybrid design, combining a street circuit's characteristic with a permanent track layout to reach a top speed of 335 km/h for F1 car drivers; first ever in the history of Vietnam and the circuit itself. The designing and paving works of high-standard racetrack pavement were done under the supervision of a German F1 accredited consultant. ADCo was awarded for the supply of a complete range of bituminous binder for Ha Noi F1 Race track including:   More than 1,500 MT polymer-modified bitumen for wearing and binder course following MSCR PG specification More than 800 MT Naphthenic based Bitumen from KBC (the Group refinery in Malaysia) for Base course Polymer Modified Emulsion for Tack coat ADCo Trackless System - A first in Viet Nam was implemented and sprayed by ADCo to preserve the integrity of the tack coat and ensure cleanliness of the site ADCo Anti-sticking agent (ASC) from the Group was part of the package for asphalt paving application.   Project name: Ha Noi Formula 1 Racetrack Products: PMB III, 60/70 Bitumen, CRS-1P Year: 2019 - 2020 Location: Ha Noi Investors: VINGROUP - Ha noi City Contractors: Minh Tam Consultant: Tilke - Germany Construction section:  2 layer of PMB III F1 including binder and wearing course on existing road 3 layers of asphalt including 60/70 KBC base course & PMB III F1 binder and wearing course for new construction