img_banner-1

Nhat Tan bridge

Most technologically advanced Bridge in Vietnam, connecting Hanoi to Noi Bai Airport.
The biggest Japanese infrastructure project in Hanoi with participants from the most reputable Japanese and American consultants and contractors. ADCo had supplied bitumen for the most critical approach road with high slope and friction at the junction with NH5A Extension. ADCo supplied 1,800 MT PMB III and 2,300 MT of 60/70 bitumen complying with high-quality control and the tight supply schedule of Tokyu Contractors.
 
Project name: Nhat Tan bridge & connection to Noi Bai & NH5A extension
Year: 2013  
Location: Hanoi City
Investors: PMU 85
Contractors: IHI, SUMITOMO MITSUI, TOKYU
Consultant: Stanley Consultants Inc (Hoa Kỳ) & CTI Engineering International Co., Ltd (Japan)
Volume: 100 MT
Scope of project: 120.000 m2 surface layer of PMB III
Spec. of PMB: PMB III

Other Projects

Maybe you are interested in our other signature projects

Ha Noi Formula 1 Racetrack

Ha Noi Formula 1 Racetrack

A showcase of innovation and expertise for the first-ever Formula 1 racetrack in Vietnam. Ha Noi Formula 1 Racetrack (North Vietnam) - total length of 5.6 km, includes 23 turns, with a unique hybrid design, combining a street circuit's characteristic with a permanent track layout to reach a top speed of 335 km/h for F1 car drivers; first ever in the history of Vietnam and the circuit itself. The designing and paving works of high-standard racetrack pavement were done under the supervision of a German F1 accredited consultant. ADCo was awarded for the supply of a complete range of bituminous binder for Ha Noi F1 Race track including:   More than 1,500 MT polymer-modified bitumen for wearing and binder course following MSCR PG specification More than 800 MT Naphthenic based Bitumen from KBC (the Group refinery in Malaysia) for Base course Polymer Modified Emulsion for Tack coat ADCo Trackless System - A first in Viet Nam was implemented and sprayed by ADCo to preserve the integrity of the tack coat and ensure cleanliness of the site ADCo Anti-sticking agent (ASC) from the Group was part of the package for asphalt paving application.   Project name: Ha Noi Formula 1 Racetrack Products: PMB III, 60/70 Bitumen, CRS-1P Year: 2019 - 2020 Location: Ha Noi Investors: VINGROUP - Ha noi City Contractors: Minh Tam Consultant: Tilke - Germany Construction section:  2 layer of PMB III F1 including binder and wearing course on existing road 3 layers of asphalt including 60/70 KBC base course & PMB III F1 binder and wearing course for new construction