slide-1
Product

Pavement Rehabilitation solutions

Cold Central Plant Recycling (CCPR)

The pavement is reclaimed at the site and then stockpiled. The reclaimed pavement materials are then characterized by laboratory tests and re-blended in a dedicated plant with water, EcoStab® emulsion, and other additives such as Portland cement. After blending, the mixture is then transported to the job site for paving application.

Reference Projects

Cold Central Plant Recycling (CCPR)